Monday, June 29, 2009

House Update 6-29-09

Things are getting close to wrapping up with the house. Less than one month to closing now!! We can hardly wait. About all that is left to do now is installing the carpet, stove, and refrigerator, final painting, and landscaping. All of this should be done by the end of next week. We will do a walk through on July 17th and closing will take place on July 27th. Hopefully, I will not be traveling the week of the 27th, so we can start moving stuff during the week and get all the big stuff moved on the weekend. Here are some pictures of the latest progress.



The outside of the house. A little landscaping on the outside and it is ready to go!

The kitchen. The hardwood floor is covered with cardboard right now.

A portion of the hardwood floor that is where the stove will be.


The master bathroom .....


and the toilet in the master bathroom.


The guest bathroom.


The pedestal sink in the downstairs half bathroom.

The pantry/laundry room. The shelves have been added.